Healthcare Construction Around Poudre Valley Hospital in Fort Collins

A hospital campus never closes, so the first question on any project near Poudre Valley Hospital is how the work stays out of the way of patients. The hospital at 1024 South Lemay Avenue runs 270 beds, 11 surgical suites, 12 intensive care beds and a Level III trauma designation, and each of those departments depends on air pressure, power and clear access staying exactly where they are. We plan renovation, expansion and neighboring medical construction around that reality: barriers go up before demolition starts, utility shutdowns are booked weeks ahead with the facility engineers, and material routes are drawn so they never cross a patient corridor.

The campus also has an ownership history that matters to a builder. The hospital opened in 1925 as Larimer County Hospital and took the Poudre Valley name in 1980. In 2012 the Poudre Valley Health System merged with the University of Colorado Hospital and became part of UCHealth, while the Health Service District of Northern Larimer County kept the land and buildings and leases them to UCHealth. On a project that can mean more than one set of owner requirements, so we ask at the first meeting who approves scope, utility outages and insurance.

Most of our work here falls into healthcare construction and phased construction on occupied sites. Both are mostly a matter of discipline, and discipline starts in preconstruction.

Work inside and beside an operating hospital

The projects that suit a campus like this are usually not new towers. They are procedural suite renovations, imaging replacements, patient-floor refreshes, central plant tie-ins, and the medical office space that grows up around a hospital because physicians want to be close to it. Each has its own demands. A surgical suite renovation is about air handling, pressure relationships and finishes that can be cleaned to a hospital standard. An imaging replacement is about structure, shielding and the route the equipment takes through the building on the day it arrives.

Next to the campus, the needs shift toward medical office construction and clinic build-outs that serve outpatient volume. These buildings are lighter than the hospital itself, but they still carry specialized plumbing, medical gas where it is required, and exam-room layouts that the clinical staff will have opinions about. We sit down with those staff early, because a mockup room costs less than a change order after the walls are closed.

Infection control and life safety while patients stay

Every opening cut in a hospital wall is an infection control decision. Before any demolition we agree on the barrier type, negative air pressure at the work area, dust monitoring, and the exact path that debris and clean materials will take. Workers enter through a defined route with a cleaning station, and the barrier is inspected daily because a torn seam found at noon is a problem that was already running since morning.

Life safety needs the same attention. When sprinklers or alarms are taken out of service for a tie-in, the outage is short, documented and covered by a fire watch, and egress paths stay open at every stage. Hospital staff are not looking over our shoulders, but they are trusting that the corridor they used last night is still the corridor they will use tonight. Keeping that promise is most of the safety plan.

Parking, shift change and the people already there

UCHealth is reported as the second largest employer in Fort Collins, with 5,900 employees in the city's 2024 annual financial report, and a workforce that size shapes a construction site. Staff arrive on shifts that overlap at odd hours, patients arrive at all hours, and emergency vehicles take priority over every delivery. Laydown space and contractor parking are therefore negotiated rather than assumed, and we schedule noisy or disruptive activity away from the busiest shift changes.

Deliveries are planned as carefully as the construction. We favor smaller, more frequent drops to a controlled dock, off-site prefabrication of headwalls and ceiling assemblies where the design allows, and a single logistics contact who tells the hospital what is arriving the next morning. It is not glamorous work, but it is the reason a project of this kind finishes without a single patient complaint reaching the owner.

City permits and the energy code

For permit applications submitted on or after April 1, 2026, Fort Collins treats the 2024 International Building Code with local amendments as the current code, and keeps the 2021 codes available for reference until October 1, 2026. We confirm the edition with the plan reviewer before pricing, and we build the schedule to include the city's review time rather than hoping it will be short. Health facility projects also face reviews that sit alongside the building permit, and those timelines belong in the plan from the first week.

Energy requirements are moving too. Colorado HB22-1362 requires any county or municipality that updates a building code on or after July 1, 2023 to adopt an energy code at least as demanding as the 2021 IECC, and from July 1, 2026 the benchmark becomes the state model low energy and carbon code. Hospitals use a great deal of energy and the owners here tend to ask good questions about it, so we bring the mechanical and envelope assumptions to the table early.

Commissioning and the work that follows

A hospital renovation is not finished when the ceiling tiles are in. Air balancing, pressure verification, medical gas testing, fire alarm acceptance and equipment start-up all have to be witnessed and recorded, and we run our commissioning and closeout process so that the documents are ready when the clinical team needs them. Occupancy dates move when this stage is rushed, so we protect it in the schedule.

The same logic applies across the region. UCHealth's Medical Center of the Rockies in Loveland was built as a sister hospital to this one, and many health-system owners we work with think of their facilities as a network. Our health system clients often ask us to carry lessons from one campus to the next, such as the barrier detail that worked or the shutdown sequence that did not.

Tell us about the campus project

Send us the scope, the department that will be affected and the dates you cannot move. We will come back with a phasing approach and a plain account of what the work will ask of your staff.

Questions Owners Ask

How do you keep dust and noise away from patient areas?

We start with an infection control risk assessment agreed with the hospital, which sets the barrier type and the air pressure at each work area. Demolition is sequenced for off-peak hours where noise carries, and we monitor particulates at the barrier so a problem shows up before a patient notices it. The barrier is inspected every day, and the superintendent walks the adjacent corridors at the start and end of each shift.

Who signs off on a project when the district owns the buildings and UCHealth leases them?

That depends on the scope and the lease, and we do not guess. The land and buildings belong to the Health Service District of Northern Larimer County, which leases them to UCHealth. At kickoff we ask the owner's representative who approves the design, who authorizes utility outages and who carries the insurance requirements, and we write that answer into the project plan.

Can utility shutdowns be arranged around surgery schedules?

Yes, but only with lead time. We prepare shutdown plans that list valves, panels and affected rooms, then review them with facility engineers and nursing leadership weeks before the work. Where possible we install temporary or parallel service so that the outage becomes a quick switchover, and we stage materials so the crew is waiting when the window opens.

What does the energy code change for a campus renovation?

It affects what must be upgraded when a system is replaced. Colorado HB22-1362 pushes local codes toward at least the 2021 IECC level for jurisdictions that update their building codes, with a state low energy and carbon benchmark following from July 1, 2026. We have the mechanical engineer test the scope against the adopted edition before bidding so there are no surprises in plan review.

Do you build the medical office buildings near the hospital, or only work inside it?

Both. Medical office and clinic buildings near the campus make up a large share of the demand, and they follow a different rhythm from interior renovations. We handle site work, structure and fit-out, and we coordinate the tenant's equipment vendors so the first patient day is not a scramble.